Natural Gas Processing Facility

A custom-designed cryogenic gas processing facility under development in the Permian Basin, featuring two 300+ MMSCFD RSV cryo trains and a 15,000 BPD stabilizer.

Overview

Project Details

West Texas

OPD is providing complete engineering, procurement, and construction services for a grassroots, custom-designed natural gas cryogenic processing facility with an initial capacity of 600+ MMSCFD and future expansion capabilities to over 1 BCF. The facility is designed with full consideration for future scalability and operational flexibility, covering all elements from concept through startup, within a fence-to-fence scope. 

an aerial view of a factory
Additional Details:
  • Completion within a critical accelerated schedule
  • 2 x 300+ MMSCFD RSV cryo plants with refrigeration
  • (Future tie-ins and capacity allowance for a third train)
  • 1 x 15,000 BPD stabilizer
  • (Infrastrucuture prepared for a future additional stablizer)
  • Amine inlet treating (2 x 1500 GPM)
  • 2 x 2,000 BBL slug catchers
Projects

You may also be interested in

View all featured projects

Get In Touch

To learn more about how OPD can support your project needs with industry-leading expertise and reliable execution, contact our team today.