OPD provided engineering, design, procurement and construction of a grassroots, custom-designed, nominal 300 MMSCFD rich gas cryogenic facility in West Texas. The scope included full design and EPC services for everything from concept to startup and from fence-to-fence.

Additional Details

  • OPD modularized 300 MMSCFD cryo plant w/ refrigeration  
  • ~11 MBPD NGL stabilizer 
  • Amine inlet treating designed for 5% CO2 
    • 2100 GPM amine regeneration  
  • Turbine-driven centrifugal residue compression (Titan 250) with waste heat recovery (2 x 100%) 

CUSTOM-DESIGN

developed with end-user to become ongoing internal plant standard.