Project Details
OPD provided engineering, design, procurement and construction of a propane/butane export terminal on the Texas Gulf Coast. This was a brownfield project with limited space for construction laydown.
![](https://www.opdepc.com/wp-content/uploads/2023/07/Propane-Butane-Export-Terminal-1024x680.jpg)
Additional Details
- 11,000 BPH propane ship loading capacity
- 30,000 HP propylene refrigeration system
- Facility capable of exporting butane or propane
Completion
within a critical Schedule
![](https://www.opdepc.com/wp-content/uploads/2023/07/1659500747909-e1690293666892.jpg)
Project Highlight:
“The innovative design of this plant allowed the loading of either Propane or Butane through a shared refrigeration system. Despite the challenge of a limited plot size, our team excelled in crafting a creative solution, resulting in a compact, yet efficient facility.”
–Srinivasa Pachipulusu, Principal Process Group Manager